Save energy. Cut CO₂. Keep comfort. The DBMU dynamically extends boiler cooling periods to eliminate unnecessary cycling — delivering typical savings of 15% or more on burner run-time.
Average ~15% reduction in burner run-time by eliminating dry/short cycling.
Saving 10,000 kWh of gas ≈ 2,500 kg CO₂ avoided. Real, measurable impact.
Never alters thermostat top-point. Learned minimum flow temp protects occupants.
The DBMU lets the burner run for 2 cycles to bring the building up to heat, measures the lowest flow temperatures, then sets a sensor minimum 5°C below the lowest measured value — a fail-safe comfort guarantor.
After start-up, the DBMU extends each cooling period by 75%. If flow temperature holds steady, E-Factor steps up (80, 82, 84… up to 90). If a LOW TEMP event occurs, the burner fires immediately and E-Factor steps down — increasing and decreasing dynamically with load.
Every 50 cycles the unit runs an automatic A/B test — one cycle without the DBMU, one with — and stores the actual measured savings %. The last three results are retained for download and reporting.
Real-life case study
Date: 02.03.2026 · Outside temperature: 13°C · Firmware 2.17 · Economy Factor 75 (span 20–90%)
Received test data
| No | Efficiency factor | Cooling — DBMU Off | Burning — DBMU Off | Cooling — DBMU On | Burning — DBMU On |
|---|---|---|---|---|---|
| 1 | 75 | 311 | 752 | 507 | 813 |
| 2 | 75 | 459 | 1192 | 1114 | 852 |
| 3 | 75 | 547 | 838 | 1140 | 741 |
Calculated results
| No | % Burn — DBMU Off | % Burn — DBMU On | Reduced firings in 24 hrs | Saving % |
|---|---|---|---|---|
| 1 | 70.74 | 61.59 | 16 | −12.93% |
| 2 | 72.20 | 43.34 | 9 | −39.97% |
| 3 | 60.51 | 39.39 | 17 | −34.90% |
Across three A/B cycles the DBMU cut burner run-time by up to ~40%, with an average reduction of around 29% — measured live on-site, not modelled.
Savings by annual consumption
Indicative annual cost reductions across typical building sizes, at three savings scenarios. Based on a gas price of 7p / kWh.
| Annual consumption | 25,000 kWh | 75,000 kWh | 125,000 kWh | 500,000 kWh | 1,500,000 kWh |
|---|---|---|---|---|---|
| Annual cost | £1,750 | £5,250 | £8,750 | £35,000 | £105,000 |
| 10% saving | £175 | £525 | £875 | £3,500 | £10,500 |
| New cost (10%) | £1,575 | £4,725 | £7,875 | £31,500 | £94,500 |
| 17.5% saving | £306.25 | £918.75 | £1,531.25 | £6,125 | £18,375 |
| New cost (17.5%) | £1,443.75 | £4,331.25 | £7,218.75 | £28,875 | £86,625 |
| 25% saving | £437.50 | £1,312.50 | £2,187.50 | £8,750 | £26,250 |
| New cost (25%) | £1,312.50 | £3,937.50 | £6,562.50 | £26,250 | £78,750 |
Illustrative figures based on 7p/kWh gas. Actual savings depend on building, plant and usage.
16%
Average savings at 10°C outside (BRE Certificate CFP 348)
10,000+
Units deployed across UK, Scandinavia, France & Germany
12–24
Months typical payback period
Recognised on the UK Energy Technology List and approved for Enhanced Capital Allowance (ECA) and the Local Authority Energy Finance Scheme (LAEF). Government-supervised testing in Norway certified the DBMU as totally safe for boilers and heating systems.
No. The DBMU never alters the thermostat's upper set-point. At start-up it learns a minimum safe flow temperature; if the flow approaches this level the burner fires immediately to protect comfort.
Yes. It's installed between the thermostat and the burner on the production side and does not conflict with distribution-side/BMS controls.
Every 50 cycles it performs an automatic A/B test: one cycle with the DBMU disabled, then one with it enabled, compares burner run-times, and stores the last three results for reporting.
The controller dynamically reduces the E-Factor (cooling-period extension). If a LOW TEMP is detected, the burner fires instantly and the E-Factor steps down for subsequent cycles.
Yes. Government-supervised tests in Norway confirmed safety and ~15% savings on 930 kW boilers. BRE Certificate CFP 348 reported average 16% savings at 10°C outside. Recognised on the UK Energy Technology List and approved for Enhanced Capital Allowance (ECA).
Want to save even more?
Inject-a-Therm
Save Energy
Achieve up to a 22% reduction using heat transfer fluid alone — pairs perfectly with the DBMU.
Speak with an accredited lead assessor for a fixed-fee quote. No hidden costs.